Small cell backhaul installation in 25 seconds

May 16, 2014
Time lapse video from Sub10 Systems.

The following new video from Sub10 Systems shows, in 25 seconds of time lapse footage, a 60 GHz backhaul installation of an 18-cm. x 18-cm. microwave system for 4G and LTE outdoor small cells. Actual installation time: < 60 minutes.

View/Download Sub10's White Paper: 60GHz Small Cell Backhaul for Service Providers (PDF)

About the Author

Matt Vincent | Senior Editor

Matt Vincent is a B2B technology journalist, editor and content producer with over 15 years of experience, specializing in the full range of media content production and management, as well as SEO and social media engagement best practices, for both Cabling Installation & Maintenance magazine and its website CablingInstall.com. He currently provides trade show, company, executive and field technology trend coverage for the ICT structured cabling, telecommunications networking, data center, IP physical security, and professional AV vertical market segments. Email: [email protected]

Sponsored Recommendations

imVision® - Industry's Leading Automated Infrastructure Management (AIM) Solution

May 29, 2024
It's hard to manage what you can't see. Read more about how you can get visiability into your connected environment.

Adapt to higher fiber counts

May 29, 2024
Learn more on how new innovations help Data Centers adapt to higher fiber counts.

Going the Distance with Copper

May 29, 2024
CommScopes newest SYSTIMAX 2.0 copper solution is ready to run the distanceand then some.